Painted, ground and cut spindles from emt piping
Added 6 more feet of ceiling
Retired electrical lines wrapped around rafters
Removed treads from stairway and added concrete and fill all the way up to the top.
Dug another post hole.
Leveled the last built flight and drive in rebar.
Cut 16 more treads.
Added most of the treads for all the built flights.
Putt in small a/c
Cleaned up main room
Built shelf for garage work table
Continued putting away tools
Built spade bit holder with drill press and installed
Removed garage doors and tracks.
Rehabbed door fittings and hinges, installed taller rails, and installed garage door panels.
Installed lights in new ceiling.
Andrew moved countertop light to center of top