Summer Projects/To Do List

Plumbing

Install toilet line to wall
Dig service line trench
Connect bath and 2nd bathroom

Drywall
Kitchen drywall

Flooring
Rip out old soft flooring
Lay new subfloor bedrooms and bath master
Replace with plywood
Prepare old floor, nails, edges, carpets

Kitchen Cabinets
Install range hood
Purchase cabinets
Prepare cabinets - stain etc

Electrical - Kitchen
Diagnose wiring circuit
Add GFI, light and switches

Siding
Add last of siding
Qc current siding

Interior Walls
Install drywall
Salvage bdrm paneling for main room
Electrical - Outside Lights And Outlets
Install six outside lights
Install 4 weatherproof outlets

Outside Cleanup
Clean up debris and materials
Take trash to dumpster
Mow grass
Rake out land, clear our brush
Plumbing Closet
Frame in closet
Add doors and paneling or drywall

Bathroom
Clean small bathroom

Ceilings
Insert insulation
Tie down all plumbing, electrical wires
Install ceiling

Gutters
Construct material list
Install gutters

Outside
Install window, door and siding trim
Paint Exterior
Power wash exterior
Survey ext for readiness
Replace wood rot on trim
Install skirting

Decks
Deck Railing-porch deck/realign
Install front deck railing
Front Deck - screw down and seal

Dock
evaluate condition-replace deck boards

Interior
Atrium Doors. Move And Install
Remove back atrium door and install on porch deck
Install new atrium door back house
Trim - Restain And Cut New
Sand mis-stained trim and restain
Install door locks 3 doors

Garage
Install garage window