Saturday, November 6, 2010

Things we still need to complete

-roofing patch front deck
-siding in front
-seal windows
-align back door, swap out atrium door
-reroute plumbing to inside
-install other support column and weld beam
-install wall insulation and interior wall panels
-check wiring and correct
-install ceiling insulation and panels
-continue replacing flooring
-build bunk beds


- Posted using BlogPress from my iPad

No comments: