Discovered Andrew nailed down the top of the siding in back so most of what I had written for Thursday tasks have been completed:
- complete front siding / over half done
- nail in back siding / done
- cut out rough finish of back room door
- re-solder water pipe / done
- install toilet / done
- install utility sink, pipe and drain
- dig footings for main beam brace
- pour footings / dug and one poured
- Jack up both sides house and support / one side up and ready for support
- install master bedroom window / done
- paint fascia / not painted but fascia scraped and ready for painting
- paint all siding
- Check wiring with Jack
Not shabby at all...
(and let's not forget the incredible unscheduled roofing makeover worked on by Deb and the kids....)