Work has pretty much ground to a halt as Mike R. recovers from his illness and the other kids return to school. I am still unable to lift anything heavier than 10 pounds nor can I bend at the waist. Deb is either working or recovering from her own injuries. Pretty much a lame group :).
Mike R. has committed to ten hours prior to his leaving on Sunday to return back to Washington state. Deb and I have decided to use this time to finish both decks; nailing in deck boards, rails and ballusters.
I have finished the water pump design and am buying the equipment to assemble. We should have gotten a water delivery today for our 210 gallon tank and I have an appointment to pick up a deep basin utility sink. We are intending on only plumbing in the one sink at this time until we are permanently connected to the city system, which will most likely be next year.
Link to Pump Manual: http://manuals.harborfreight.com/manuals/2000-2999/2955.pdf