Thursday, August 19, 2010

Tasks

Things to do at the lake

1). Adjust rail height if needed. Drill out stripped screw.  Insstall deck boards and then balusters and back rails and top plank.
2) deck boards front deck
3) courtyard--trim out greenery and level out grounds.  Mike r said he would do this 
4) continue burning and moving trash to dumpster.  We won't have dumpster much longer
5) clean out garage
6) mark water meter 
7) wood flooring.  Deb wants to replace the entire floor where possible.  Measure the thickness of the current flooring and keep an eye out for cheap plywood on craigslist.  We anticipate needing about forty sheets for floor and roof.  Remove a section of flooring and evaluate the supports underneath--install blockers where needed.  Hardest area to replace will be hallway where flooring goes under walls.  Don't sweat this, just cut out as close to wall as possible.
8). Siding - start on side of garage to gain skill and knowledge of process and then move to the back.  Install skirting on back from ground to wall to cover existing opening.
9) roof - consult with deb on our create a hole approach.  Reconnect the stove pipe after opening hole
10) water tank and pump - talk to deb 

No comments: