Priority Task


1 Cassions for posts
1 Outside clean up - remove wood pile side house, clean under deck
1 Dumpster
1 Move water tank
1 Install tank heater and heat tape
1 Repair garage doors
1 Set back door
1 Check for holes in outside walls
1 Plumbing for bathrooms
1 Finish front siding
1 Install door locks and door bars
1 Electrical review and corrections: add switches, fixtures
1 Caulking windows inside and out
1 Install skirting, repair hole in front skirting
1 Stain outside porch deck, stain entire front deck
1 Garage door opener / repair or replace

2 replace atrium door
2 Plumbing utility sink/washer
2 Straighten steps and install railing
2 Insulation in interior walls
2 Lighting back room
2 Add trim to exterior windows, doors and siding
2 Install porch, front, back lighting
2 Replace flooring

3 replace sliding glass door
3 plumbing - kitchen
3 Level deck railing
3 Clean garage
3 Work bench in back room
3 Install vanity bathroom
3 Replace interior paneling and ceiling

4 Window in garage
4 Install hardwood floors