Wednesday, April 24, 2013

Bathroom nearly complete

Today was the day of the bathroom. Rebuilt the structure of the interior walls, replaced plumbing stubs, installed wall panels, laid floor tiles, installed vanity mirror and vanity.





Deb and I laid the floor tiles. She did the hard corners like the toilet and I did the easy stuff. Apparently the four arrows on the back of each tile aren't directions on which way to peel off the paper backing but instead show how they are to be oriented when applied to the floor. Oops.


Our problem area. We've decided to cover the paneling with drywall after which Deb will cover the entire wall with stick and peel tile.

No comments: