Thursday, November 18, 2010

This is the joist and rafter structure we are thinking about raising to create more slope.















Here is a look at the main end I beam after raising the right side five inches.



A close up look of the crack after raiding the right side today. We had raised the left side about three inches several weeks ago. The top half of the weld gaped open at least 3/8ths of an inch and now it's closed tight and ready for welding.



These are the posts for the back steps handrail.







The footing poured for the other I-beam support.